Track Installation — MezaanTel
NOC Tracking Radar

Track Your WIFI Setup.

Enter your secure Order ID below to view the live deployment status of your high-speed internet connection.

Behind The Scenes

The Fiber Journey.

Ever wondered what happens after you hit submit? Here is our highly optimized and automated deployment process.

01

Node Allocation

Our backend system instantly allocates a dedicated port on the nearest XPON Fiber Node to your house.

02

Scheduling

A dispatch agent calls you to confirm your exact location and schedule a convenient time for the installation.

03

Splicing

Field engineers arrive and physically splice the delicate optical fiber cables directly into your premises.

04

Activation

Your new Dual-Band Router is powered on, configured remotely from NOC, and tested for symmetrical speeds.

Deployment FAQs

Usually, we deploy connections within 24 to 48 hours of your order placement. The actual physical work at your house (drilling, cable routing, and router setup) takes about 60 to 90 minutes.

Yes. Since our field engineers need to bring the fiber cable inside your home and set up the WiFi router in an optimal central location, an adult must be present to guide them.

Absolutely! If you are unavailable on the scheduled date, you can simply click the WhatsApp Support button below to inform our dispatch team to choose a new time slot.

Need to change your schedule?

If you entered incorrect details or need to urgently reschedule your fiber drop, our dispatch agents are available on WhatsApp.

Message Dispatch Team